Street Department

Street Department Responsibilities

This department is staffed by 5-7 full time individuals. All street related maintenance is their responsibility. This includes milling and hot asphalt repair, crack sealing, street sweeping, pot hole repairs, snow removal, sign maintenance, and mowing. They also do traffic marking,weed control,all maintenance of the flood control structures and dikes, and the storm drainage system. Public Works staff maintains all departmental equipment along with several other City Departments.

Street Crew Smoothing out Concrete

  1. Joe Hawk

    Utilities Supervisor

  2. Public Works

    Physical Address
    601 NW Second St.
    Abilene, KS 67410

    Phone: 785-263-3510
    Fax: 785-263-3594